Closing went fairly well. There are a couple of things that are still on the "to-do" list for K. Hovnanian:
- Sidewalks need to be repaired/repoured (they cracked them when they did the grading of the land). This will have to be redone in the spring...
- The siding on the back of the house needs to be repaired where they screwed in the railing needed for the house to be up to code.
- The stain on the railings needs to be redone. Whoever put the second coat on did a sloppy job that is definitely below expectations. There was even a brush bristle in the finish coat!
- The lawn needs to be installed, but that will have to wait until spring.
During the 30 day walk through, we pointed out a couple of items that were concerns:
- The stain on the stairwell (K. Hov's fault)
- A small dent in the sink (unsure of fault-could be ours)
- A small pop in the countertop, presumably from moisture, although it is not in a typical problem spot (probably our fault, but strange
- The siding on the back of the house was never repaired (K. Hov's fault)
- The painters got colored paint on the tops of most of the door moldings, which should be white (the painter's fault-sloppy!!!)
- The heat needs to be balanced (normal for a new house)
- The kitchen sink's seal popped (probably normal, but I'm not sure)
I especially want to complement the paint/stain guy. He arrived at 9 am and took almost 4 hours sanding down the railings. He had another scheduled job at 1, which he went to (at my suggestion) and then returned to keep working. He was back around 3. He worked until 5, when he had another job which he went to (again, at my suggestion) and then returned around 6:30 to finish. He left our house around 8. He never once complained, and his work was impeccable!!! The stain looks amazing. I can't say enough nice things about him! I wish I could remember his name... I think it was Lee, but I could be wrong...
I really love how they fixed up anything that was not up to par. Great job, maintenance department!