Well, we had the walk-through on Friday, and we discussed some finishing items that needed to be touched up.  Here is what I can remember of the list and any updates I found after stopping by on Monday afternoon.


  • paint touch ups everywhere, especially the basement (all paint touch ups were done.  I found one spot we missed during the walk-through, but I can touch that up myself since they gave us the extra paint)
  • Railings/spindles still need to be stained and finished.  [This is still not done, but it looks like they were working on it today]
  • Master linen closet doors were damaged.  Jason offered to replace them, since paint would not fully cover the issues.  [Done!]
  • Furnace-possible gas leak, need filters [Done!]
  • Cabinets-touch up stain and align cabinet doors [to be completed]
  • Tempered glass window needs to be moved to the proper place [to be completed]
  • Touch up paint on front door [Done!]
  • Fix lump in basement carpet [to be completed]
  • Add outlet in pantry [done]
  • Nail side of cabinet in kitchen [Done!]
  • Insert screw covers in back slider [Done!]
  • Finish installing doorknobs [Done!]
  • Reverse two switches [Done!]
  • Adjust closet doors [Done, but I'm not totally satisfied with one of them]
  • Repair sidewalks [They were cracked during grading; this may be done in the spring since the weather is much cooler now and the grading on our property may not be totally finished.] 
Bank paperwork tomorrow, keys Wednesday.  I also ordered all of our window treatments (shades and blinds), so that is now taken care of.  I started setting up utilities, but current debate is Cable vs Dish.  Any thoughts?